The cost incurred by using both fixed and variable factors in production is called
ECONOMICS
WAEC 2001
The cost incurred by using both fixed and variable factors in production is called
- A. marginal cost
- B. fixed cost
- C. total cost
- D. average cost
Correct Answer: C. total cost
Post an Explanation Or Report an Error
If you see any wrong question or answer, please leave a comment below and we'll take a look. If you doubt why the selected answer is correct or need additional more details? Please drop a comment or Contact us directly. Your email address will not be published. Required fields are marked *

